Monthly Archives: August 2012

Framing

With most of the joist soundproofing and the HVAC out of the way, it was time to start framing. As suspected, the short wall of the little room was load bearing, so I needed to have the wall replaced with … Continue reading

Posted in Edenwilde Theater | Comments Off on Framing