Monthly Archives: August 2012
Framing
With most of the joist soundproofing and the HVAC out of the way, it was time to start framing. As suspected, the short wall of the little room was load bearing, so I needed to have the wall replaced with … Continue reading
Posted in Edenwilde Theater
Comments Off on Framing