While the rest of the house was being buttoned up and prepared for drywall by the contractors, I went in and pre-wired all the low voltage cables for speakers, networking and the projector. I also installed conduit between the projector location and equipment closet for any future cable needs and test mounted the pipe for the projector.
Wiring
This entry was posted in Cherrybank Theater. Bookmark the permalink.