One of the best moves I made during this project was the hiring of a contractor to install the drywall and to mud and tape the seams. For soundproofing, 5/8″ drywall was used in two layers, with Green Glue sandwiched in between. It was amazing to watch only two guys put everything in place and only one piece in the entire job had to be recut. The really amazing part was how good the arches in the hallway came out. These guys did an amazing job. One thing you might also notice, the double doors that were once in the front of the room were removed and “walled” over. You would never even know it was once there.
Drywall
This entry was posted in Edenwilde Theater. Bookmark the permalink.